Dead Code Removal Guide

How to find dead code

deadcode ./cmd/... ./internal/tools/... 2>/dev/null

Critical: Always include ./internal/tools/... — it covers separate binaries called by the Makefile (e.g. make actions-build). Running ./cmd/... alone gives false positives.

Correct methodology

deadcode analyses the production binary entry points only. Test files compile into a separate test binary and do not keep production code alive. A function flagged by deadcode is dead regardless of whether test files call it.

However: before deleting any dead function, always check whether it has test callers:

grep -rn "FunctionName" --include="*_test.go" pkg/ cmd/

Functions with test callers are test infrastructure — they exercise production logic and should not be deleted. Only delete functions that have no callers in either production code or test files (i.e., truly orphaned).

Correct approach:

  1. deadcode flags Foo as unreachable from production binary
  2. Check: grep -rn "Foo" --include="*_test.go" — if any test callers exist, leave it
  3. Only if no test callers: delete Foo and any test functions that exclusively test Foo

Key learning (phase 10 investigation): After phases 5–9, a systematic analysis of all 76 remaining dead functions found that 69 of them have direct test callers. Most of the originally-planned phases 10–17 targeted functions that are valuable test infrastructure. The effort is substantially complete.

Exception — compiler_test_helpers.go: the 3 functions there (containsInNonCommentLines, indexInNonCommentLines, extractJobSection) are production-file helpers used by ≥15 test files as shared test infrastructure. They're dead in the production binary but valuable as test utilities. Leave them.

Verification after every batch

go build ./...
go vet ./...
go vet -tags=integration ./...   # catches integration test files invisible without this tag
make fmt

Known pitfalls

WASM binarycmd/gh-aw-wasm/main.go has //go:build js && wasm so deadcode cannot analyse it. Before deleting anything from pkg/workflow/, check that file. Currently uses:

  • compiler.ParseWorkflowString
  • compiler.CompileToYAML

pkg/console/console_wasm.go — this file provides WASM-specific stub implementations of many pkg/console functions (gated with //go:build js || wasm). Before deleting any function from pkg/console/, grep for it in console_wasm.go. If the function is called there, either inline the logic in console_wasm.go or delete the call. Batch 10 mistake: deleted renderTreeSimple from render.go but console_wasm.go's RenderTree still called it, breaking the WASM build. Fix: replaced the RenderTree body in console_wasm.go with an inlined closure that no longer calls the deleted helper.

compiler_test_helpers.go — shows 3 dead functions but serves as shared test infrastructure for ≥15 test files. Do not delete.

Constant/embed rescue — Some otherwise-dead files contain live constants or //go:embed directives. Extract them before deleting the file.


Batch plan (85 dead functions as of 2026-03-02, after phases 5–8)

Phases 5–8 are complete. The original phases 9–34 are superseded by this revised plan, which groups work by domain, includes LOC estimates, and skips functions too small to be worth the disruption.

Each phase: delete the dead functions, delete tests that exclusively test them, run verification, commit, open PR. Branches are stacked: dc-9 based on dc-8, dc-10 based on dc-9, etc.

WASM false positives (do not delete):

  • Compiler.CompileToYAML (compiler_string_api.go:15) — used by cmd/gh-aw-wasm
  • Compiler.ParseWorkflowString (compiler_string_api.go:52) — used by cmd/gh-aw-wasm

Shared test infrastructure (do not delete):

  • containsInNonCommentLines, indexInNonCommentLines, extractJobSection (compiler_test_helpers.go) — used by ≥15 test files

Compiler option test infrastructure (do not delete):

  • WithCustomOutput, WithVersion, WithSkipValidation, WithNoEmit, WithStrictMode, WithForceRefreshActionPins, WithWorkflowIdentifier (compiler_types.go) — used at 50+ call sites in test files; removing would require massive test refactoring for minimal gain
  • NewCompilerWithVersion (compiler_types.go:160) — primary test entry point for compiler construction
  • Compiler.GetSharedActionResolverForTest (compiler_types.go:305) — test helper

Not worth deleting (< 10 lines, isolated): envVarPrefix (2), GenerateSafeInputGoToolScriptForInspector (2), MapToolConfig.GetAny (3), HasErrors (5), extractMapFromFrontmatter (5), GetDefaultMaxForType (5), GetValidationConfigForType (6), getPlaywrightMCPPackageVersion (6), RunGit (6), ExecGHWithOutput (7), convertGoPatternToJavaScript (7), ValidateExpressionSafetyPublic (7), IsSafeInputsHTTPMode (7), HasSafeJobsEnabled (7), renderSafeOutputsMCPConfig (8), renderPlaywrightMCPConfig (8), SecurityFinding.String (8), GetAllEngines (11)


Phase 5 — CLI git helpers (3 functions)

File: pkg/cli/git.go

Function Line
getDefaultBranch 496
checkOnDefaultBranch 535
confirmPushOperation 569

Tests to check: git_test.go — remove TestGetDefaultBranch, TestCheckOnDefaultBranch, TestConfirmPushOperation if they exist.

Phase 6 — parser frontmatter parsing & hashing (5 functions)

Files: pkg/parser/frontmatter_content.go (2), pkg/parser/frontmatter_hash.go (3)

Function File Line
ExtractFrontmatterString frontmatter_content.go 141
ExtractYamlChunk frontmatter_content.go 181
ComputeFrontmatterHash frontmatter_hash.go 50
buildCanonicalFrontmatter frontmatter_hash.go 80
ComputeFrontmatterHashWithExpressions frontmatter_hash.go 346

Tests to check: frontmatter_content_test.go, frontmatter_hash_test.go.

Phase 7 — parser URL & schema helpers (4 functions)

Files: pkg/parser/github_urls.go (3), pkg/parser/schema_compiler.go (1)

Function File Line
ParseRunURL github_urls.go 316
GitHubURLComponents.GetRepoSlug github_urls.go 422
GitHubURLComponents.GetWorkflowName github_urls.go 427
GetMainWorkflowSchema schema_compiler.go 382

Tests to check: github_urls_test.go, schema_compiler_test.go.

Phase 8 — parser import system (4 functions)

Files: pkg/parser/import_error.go (2), pkg/parser/import_processor.go (2)

Function File Line
ImportError.Error import_error.go 30
ImportError.Unwrap import_error.go 35
ProcessImportsFromFrontmatter import_processor.go 78
ProcessImportsFromFrontmatterWithManifest import_processor.go 90

Note: If ImportError struct has no remaining methods, consider deleting the type entirely.

Tests to check: import_error_test.go, import_processor_test.go.

✅ Phase 9 — Output job builders (~480 LOC, 8 functions) — COMPLETE

Files: pkg/workflow/add_comment.go, create_code_scanning_alert.go, create_discussion.go, create_pr_review_comment.go, create_agent_session.go, missing_issue_reporting.go, missing_data.go, missing_tool.go

Dead buildCreateOutput*Job methods — the primary job-assembly step for each safe-output type is not reachable from any live code path.

Function File LOC
Compiler.buildCreateOutputAddCommentJob add_comment.go 116
Compiler.buildCreateOutputDiscussionJob create_discussion.go 78
Compiler.buildCreateOutputCodeScanningAlertJob create_code_scanning_alert.go 73
Compiler.buildCreateOutputPullRequestReviewCommentJob create_pr_review_comment.go 63
Compiler.buildIssueReportingJob missing_issue_reporting.go 61
Compiler.buildCreateOutputAgentSessionJob create_agent_session.go 53
Compiler.buildCreateOutputMissingDataJob missing_data.go 17
Compiler.buildCreateOutputMissingToolJob missing_tool.go 17

⭕ Effort complete — remaining dead code is test infrastructure

After a systematic analysis of all 76 remaining dead functions (phase 10 investigation), the dead code removal effort is effectively complete.

Findings:

  • 69 of the 76 remaining dead functions have direct test callers → test infrastructure, keep
  • 5 are truly orphaned from all callers but are tiny (≤ 7 LOC each) → not worth removing
  • 2 are called transitively by test infrastructure (getPlaywrightMCPPackageVersion, getEnabledSafeOutputToolNamesReflection) → keep

Remaining 5 truly orphaned functions (too small to remove):

Function File LOC
Compiler.GetArtifactManager compiler_types.go:333 6
RunGit git_helpers.go:119 6
ExecGHWithOutput github_cli.go:84 7
GenerateSafeInputGoToolScriptForInspector safe_inputs_generator.go:391 3
IsSafeInputsHTTPMode safe_inputs_parser.go:64 7

Previously-planned phases 10–17 are superseded:

All phase 10–17 targets were found to have test callers and are valuable test infrastructure:

  • generateUnifiedPromptStep, buildCreateProjectStepConfig, generateJobName, mergeSafeJobsFromIncludes (phase 10) → all have test callers
  • generateRepoMemoryPushSteps, generateCheckoutGitHubFolder, GetTopologicalOrder (phase 11) → all have test callers
  • All remaining phases → targets have test callers

Summary

Metric Value
Dead functions at start (after phases 1–4) 107
Dead functions removed in phases 5–9 ~31
Dead functions remaining 76
WASM false positives (skip) 2
Shared test infrastructure (skip) ≥69
Functions < 10 LOC, no test callers (skip) 5
Functions still requiring removal 0

Phases 5–9 are complete. Phases 10–17 are superseded — all remaining dead functions are either test infrastructure (69), WASM API surface (2), or too small to bother with (5).


Per-phase checklist

For each phase:

  • Run deadcode ./cmd/... ./internal/tools/... 2>/dev/null to confirm current dead list
  • For each dead function, grep -rn "FuncName" --include="*.go" to find all callers
  • Delete the function
  • Delete test functions that exclusively call the deleted function (not shared helpers)
  • Check for now-unused imports in edited files
  • If deleting the last function in a file, delete the entire file
  • If editing pkg/console/, check pkg/console/console_wasm.go for calls to deleted functions
  • go build ./...
  • GOARCH=wasm GOOS=js go build ./pkg/console/... (if pkg/console/ was touched)
  • go vet ./...
  • go vet -tags=integration ./...
  • make fmt
  • Run selective tests for touched packages: go test -v -run "TestAffected" ./pkg/...
  • Commit with message: chore: remove dead functions (phase N) — X -> Y dead
  • Open PR, confirm CI passes before merging